In order to improve the prediction accuracy and test the generalization ability of the dam deformation analysis model, the back-propagation(BP) neural network model for dam deformation analysis is studied, and the merging model is built based on the neural network BP algorithm and the traditional statistical model. The three models mentioned above are calculated and analyzed according to the long-term deformation observation data in Chencun Dam. The analytical results show that the average prediction accuracies of the statistical model and the BP neural network model are ~ 0.477 and +- 0.390 mm, respectively, while the prediction accuracy of the merging model is ~0. 318 mm, which is improved by 33% and 18% compared to the other two models, respectively. And the merging model has a better generalization ability and broad applicability.
In order to overcome the wide-range load tracking and unknown disturbance issues of an ultra-supercritical boiler- turbine unit, a fuzzy disturbance rejection predictive control approach is proposed using the techniques of fuzzy scheduling, model predictive control and extended state observer. Local state-space models are established on the basis of nonlinearity analysis and subspace identification. To eiJiance thedisturbance rejection capability of the controller, a extended state observer is employed to estimate unnown disturbances and model mismatches. The disturbance estimation ennaced local predictive controllers ae subsequently devised based on the local models, the performance of which is further strengthened by incorporating the fuzzy scheduling technique. The simulation results verify the merits of the proposed strategy in achieving satisfactory wide-range load tracking ad disturbance rejection performance.