您的位置: 专家智库 > >

国家自然科学基金(61202379)

作品数:1 被引量:2H指数:1
发文基金:国家教育部博士点基金国家自然科学基金国家重点基础研究发展计划更多>>
相关领域:自动化与计算机技术更多>>

文献类型

  • 1篇中文期刊文章

领域

  • 1篇自动化与计算...

主题

  • 1篇OPTICA...
  • 1篇DATA_C...
  • 1篇DELAY
  • 1篇CENTER...
  • 1篇DIFFER...
  • 1篇SCHEDU...

传媒

  • 1篇China ...

年份

  • 1篇2015
1 条 记 录,以下是 1-1
排序方式:
Delay-Differentiated Scheduling in Optical Packet Switches for Cloud Data Centers被引量:2
2015年
We consider differentiated timecritical task scheduling in a N×N input queued optical packet s w itch to ens ure 100% throughput and meet different delay requirements among various modules of data center. Existing schemes either consider slot-by-slot scheduling with queue depth serving as the delay metric or assume that each input-output connection has the same delay bound in the batch scheduling mode. The former scheme neglects the effect of reconfiguration overhead, which may result in crippled system performance, while the latter cannot satisfy users' differentiated Quality of Service(Qo S) requirements. To make up these deficiencies, we propose a new batch scheduling scheme to meet the various portto-port delay requirements in a best-effort manner. Moreover, a speedup is considered to compensate for both the reconfiguration overhead and the unavoidable slots wastage in the switch fabric. With traffic matrix and delay constraint matrix given, this paper proposes two heuristic algorithms Stringent Delay First(SDF) and m-order SDF(m-SDF) to realize the 100% packet switching, while maximizing the delay constraints satisfaction ratio. The performance of our scheme is verified by extensive numerical simulations.
LI YaofangXIAO JieWU BinWEN HongYU HongfangYANG ShuXIN ShanshanGUO Jianing
共1页<1>
聚类工具0