Domestic nuclear power plants are basically located in the seaside, plant site according to the planning requirements, through the site level to meet the nuclear power unit and supporting engineering layout requirements, different regions of the site and the gay love situation is different. There are a variety of buildings in the plant, different buildings, according to their importance, their seismic requirements are different. Therefore, although the buildings in the factory are located in the same area, the seismic requirements of different buildings and the ground foundation conditions of the site are different. The designed ground motion parameters cannot be determined directly according to the Chinese ground motion parameter zoning map of GB18306-2015 and the provisions of the building seismic design code of GB50011-2010, but need to be re-calculated.